← All articles

15 November 2026

NSW's New Vegetation Orders: What Councils Can Now Demand Over Unlawful Clearing

NSW's New Vegetation Orders: What Councils Can Now Demand Over Unlawful Clearing

Excavator and site worker beside disturbed land, sediment controls and trees

NSW councils now have a more direct way to respond when vegetation is cleared unlawfully. New rules create a Vegetation Order that can require clearing to stop and, in some cases, require remediation to replace what was removed.

The changes took effect on 23 October 2026 through the Environmental Planning and Assessment Amendment (Vegetation) Regulation 2026 and the State Environmental Planning Policy Amendment (Vegetation) 2026. For owners, developers and people advising them, the practical message is to check approval requirements before work starts, and to respond promptly if council raises a concern.

This article explains the new powers, their potential effect on complying development certificates (CDCs), and some steps to consider if your property has a recent clearing history. You can also read the NSW Government’s summary of the vegetation policy changes.

What Is a Vegetation Order?

A Vegetation Order is a new type of development control order under the Environmental Planning and Assessment Act 1979. A local council can issue one where vegetation has been cleared in contravention of the Act.

Previously, development control orders generally addressed unauthorised building or subdivision work. Clearing that was not connected to either could fall outside those orders. The new power gives councils a direct way to address unlawful clearing, including in urban areas where the Department of Climate Change, Energy, the Environment and Water may not take an active interest.

Depending on the circumstances, an order can require an owner or developer to:

  • stop clearing; and/or
  • carry out remediation work to replace cleared vegetation.

An order can relate to native or exotic vegetation. That means the loss of amenity vegetation may also be relevant, even if it is not native.

Project managers reviewing plans at an active construction site

What Counts as Clearing?

The definition is broad. “Vegetation” means a tree or other plant. “Clearing” includes cutting down, felling, uprooting, killing, poisoning, ringbarking, burning or otherwise destroying vegetation. It also includes lopping or removing a substantial part of it.

Clearing is therefore not limited to removing a whole tree. Damage caused by poisoning, ringbarking or substantial lopping may also be relevant. If you are unsure whether proposed work requires approval, check the applicable planning controls and speak with council before proceeding.

Who Should Pay Attention?

These changes matter to anyone planning or managing vegetation work. They are particularly relevant to:

  • landowners holding sites for future development, including land that has been left untended;
  • developers undertaking site preparation or works before a development application is determined;
  • owners or purchasers of property with a history of recent clearing; and
  • certifiers and consultants advising on a proposed CDC.

A site’s development potential does not, by itself, resolve whether past clearing was authorised. If vegetation was removed before a property changed hands, it is still important to understand the site history and any outstanding requirements before planning the next stage.

How the Rules Affect Complying Development

The new provisions place restrictions on when a certifier can issue a CDC. A certifier must not issue one where they know, or ought reasonably to know, that vegetation on the land was cleared in contravention of the State Environmental Planning Policy (Biodiversity and Conservation) 2021. In broad terms, this concerns clearing in a non-rural area without required development consent, a council tree permit or Native Vegetation Panel approval.

The restriction does not apply if the clearing occurred more than five years earlier, or if a development control order was issued and its conditions have been satisfied. The “ought reasonably to know” test means a certifier cannot simply disregard obvious signs of clearing in the last five years.

A CDC is also restricted for development involving clearing of:

  • vegetation on land that is not private land under the Local Land Services Act 2013;
  • a tree listed on the council’s register of significant trees; or
  • native vegetation where clearing exceeds the biodiversity offsets scheme threshold.

Where a CDC is issued for building or subdivision work on land where vegetation has been cleared, and an environmental planning instrument requires replacement vegetation, the certificate must include a condition requiring that replacement vegetation to be retained and maintained.

In practice, this makes a documented site history and clear information about approvals especially important when a CDC is being considered.

Council Tree Permits Involve More Assessment

The changes also specify matters a council must consider before issuing a tree or vegetation permit. These include the vegetation’s health, age and size; its biodiversity value; the impact of clearing on other vegetation on the lot and adjoining lots; whether there are viable alternatives to clearing; and any other matters set out in a development control plan or council-adopted policy.

Applicants should be prepared to provide supporting information and allow time for a more documented assessment. Requirements will depend on the property and the relevant local controls. A planning or environmental assessment can help set out the proposal, explain alternatives and respond to the matters council is required to consider.

If You Receive an Order

An order should be read carefully and addressed in the manner and time specified. Consider these practical steps:

  1. Read the complete order. Note what it requires, the affected area and any deadlines. Keep all attachments and related council correspondence.
  2. Pause relevant work. Check the order’s directions before undertaking further clearing or site works.
  3. Build a clear site record. Gather approvals, permits, plans, photographs, contractor records and any available evidence of when clearing occurred.
  4. Get planning and environmental advice early. The response may need to address the planning history, the extent of clearing and the proposed remediation.
  5. Check appeal rights promptly. There is a right of appeal to the Land and Environment Court within 28 days. Once an appeal is made, it is possible to apply for a stay, which is a suspension of the order.

An appeal does not automatically suspend an order. A stay requires a separate application. If you are considering an appeal or need legal advice, consult a solicitor. FIDES can assist with planning and environmental aspects of a response, but contacting us does not change an order or extend its deadlines.

If you are buying land, consider checking the site history and available planning records for recent vegetation clearing and any related council action. Raise questions about approvals and outstanding requirements as part of your due diligence.

What Remediation or Replanting May Involve

Remediation is not necessarily limited to planting new trees. The work will depend on the terms of the order and the site. It may include replanting appropriate vegetation, preparing the ground, addressing soil impacts, protecting replacement planting and maintaining it as required. An assessment by a suitably qualified professional may also be needed.

Civil construction works on a site beside established trees

Vegetation planted as a consequence of a development control order cannot later be cleared without development consent or a council permit, even where that type of vegetation would normally not require a permit under the relevant development control plan.

The physical work and its documentation both matter. A considered response can identify what the order requires, set out how work will be delivered and record completion and ongoing maintenance. FIDES can assist with planning advice, environmental assessment and reporting, and on-site remediation or replanting through our civil and landscaping capability. Learn more about our council order support, environmental remediation services and civil works.

Penalties and Proposed Civil Proceedings

On-the-spot fines for unauthorised clearing in non-rural areas have increased. Previously, they were generally $3,000 for individuals and $6,000 for corporations. The new amounts are $3,000 or $6,000 for individuals, and $9,000 or $18,000 for corporations, with the higher amounts applying to the more serious category of breach.

Separately, the Environmental Planning and Assessment Amendment (Vegetation) Bill 2026 is before the NSW Parliament. It is proposed, not yet law. If passed, it would allow councils to bring class 4 civil proceedings in the Land and Environment Court, in addition to existing enforcement options. Proposed maximum civil penalties are half the maximum criminal penalties: $500,000 for an individual and $2.5 million for a corporation. The civil standard of proof would apply, meaning the balance of probabilities. We will update this article if the Bill passes.

Frequently Asked Questions

Does an order mean I must replant immediately?

Not necessarily. The order sets out what is required and any relevant timing. Read it carefully and get advice if you need help understanding the scope or preparing a response.

Can I clear exotic vegetation without a permit?

Not automatically. The Vegetation Order provisions can apply to native or exotic vegetation, and other planning controls may apply to proposed clearing. Check the rules for the particular site and work before proceeding.

Can I still apply for a CDC if clearing has occurred?

It depends on the timing and circumstances, including whether a certifier knows or ought reasonably to know that clearing contravened the relevant SEPP, and whether an applicable order has been satisfied. A certifier must also consider the other restrictions on CDCs involving specified land or vegetation. Seek advice based on the site history and proposal.

Where can I get help responding to council?

FIDES can help review planning matters, coordinate environmental assessment and reporting, and undertake remediation or replanting works where required. For legal advice or representation, consult a solicitor.

Discuss Your Property

If council has contacted you about clearing, or you are assessing a site with a recent clearing history, our team can help you understand the planning and environmental work that may be needed.

Call 1300 513 069 or email planning@fidesenvironmental.com.au. You can also contact FIDES to discuss your property.

This article provides general information, not legal advice. Requirements depend on the facts of each property and the applicable planning controls.